Home | News | General | FG To Shut Third Mainland Bridge From July 24 To 2021 January
“PDP Is Only Interested In Edo Treasury” – Ganduje
DSS Denies Arresting EFCC Boss, Ibrahim Magu

FG To Shut Third Mainland Bridge From July 24 To 2021 January





The Federal Government is set to shut the Third Mainland Bridge for six months starting from Friday, July 24.

This was confirmed by the Federal Controller of Works in Lagos, Olukayode Popoola..

alt

According to him, consultations are ongoing for another phase of repair works to begin on the 11.8km bridge.

Popoola explained that the work will commence on the outward mainland section of the bridge, and the ministry is working with relevant agencies to perfect traffic during the period.

The bridge has gone through a series of repair works and was last shut in August 2018 for a three-day investigative maintenance check.

There have also been reports of some worn-out expansion joints on the structure, raising concerns over the state of the bridge.

This development will force motorists in Lagos who ply the bridge to begin making arrangements for alternative routes.

Advertisements

CLICK HERE TO READ MORE FROM: General Visit website



Loading...

view more articles

About Article Author

Chuka (Webby) Aniemeka
Chuka (Webby) Aniemeka

Chuka is an experienced certified web developer with an extensive background in computer science and 18+ years in web design &development. His previous experience ranges from redesigning existing website to solving complex technical problems with object-oriented programming. Very experienced with Microsoft SQL Server, PHP and advanced JavaScript. He loves to travel and watch movies.

View More Articles

100 Most Popular News

1 2 Displaying 1 - 100 of 151